Through-out this project, our team has had both good and bad days with absences, slacking etc.
In this post, I hope to look at what went well with our project as well as what didn't go quite as well.
What went well?
13th March - Website Design. We were given the task to create a wireframe product of what we would like our website to look like. I think this went quite well as we all got to work on an individual design that we liked then got to come together and discuss the aspects of our designs. In the end, we decided to merge aspects from all three designs.
19th March - Logo Design. I think that this went well for all the same reasons that the website design went well. We all went off and created a logo for our website before coming together and discussing. Again, we ended up taking aspects from all three logos.
25th May - Meeting. The meeting was a real help for me with the project plan as well as finding out exactly where we all were. After the meeting, I was able to amend my project plan so that it was correct.
What didn't go so well?
28th Janurary - Tools & Techniques. I made quite a big mistake when trying to think ahead and the types of tools and techniques that we would be using. We ended up only really using two techniques & one tool, HTML, CSS & Notepad.
15th April - Project Plan. This part of the project really didn't go well for any of. Although Microsoft Project is a pretty simplistic program, we all ended up finding it quite hard to create a useable plan. We later had to amend our plan in our meeting on the 25th.
10th May - Final Layout Design. This aspect of the project, at first, went wrong and this was down to me. I took it upon myself to create the actual design of the website and coding it (taking the other two's aspects into consideration). This was not part of the assigment. We were suppose to do our own parts of the website in both design and coding. We ended up redoing the website later that month.